Completed work in New Jersey. DeMarco Flooring, Tile & Renovations is now based in Fort Myers, Florida — see where we work now

Home / Service Areas / Whitehouse Station, NJ

Tile, floors and baths built in Whitehouse Station, NJ

Most of Whitehouse Station was built between 1990 and 2005, and those houses were hitting the age where the original builder-grade bathroom gives out all at once.

Curbless shower under construction in Whitehouse Station, NJ with an elongated picket marble-look accent wall, hexagon mosaic pan and brass trim
Two showers, picket and lattice tile
Town
Whitehouse Station
Zip
08889

Whitehouse Station, New Jersey

What did DeMarco build in Whitehouse Station, NJ?

DeMarco Flooring, Tile & Renovations worked in Whitehouse Station, NJ (08889) and the rest of Readington Township until relocating to Fort Myers, Florida in 2026. The work here was porcelain and natural-stone tile, hardwood, luxury vinyl plank and heated floors, along with full bathroom, kitchen and basement renovations. There was no showroom to visit — samples came to the house, and estimates were done in person, because the subfloor is what sets the price. This page is kept as a record of that work. DeMarco now installs tile across Southwest Florida.

Readington Township holds two separate communities with similar names: Whitehouse Station, which carries the commercial and municipal centre and the train stop, and Whitehouse itself about a mile up the road. We worked in both. Readington Township's subdivisions went up fast, and they went up well enough — but a 1990s builder bathroom was assembled from a fibreglass tub-shower unit, a moisture-resistant drywall surround and a vinyl floor, and all three of those have a service life. Around the 25 to 30 year mark the caulk joint at the tub flange fails, water gets behind the surround, and the subfloor under the toilet flange starts to go soft. Most of the calls we took here were that same story. The upside was that these houses are conventionally framed, flat and square, so once the rot was cut out the tile work went quickly.

Local conditions

What was different about working on a Whitehouse Station home

Why did 1990s builder bathrooms fail all at once?

Because everything in them was installed at the same time and has roughly the same service life.

The fiberglass tub surround relies on a caulk joint rather than a waterproofing membrane. Once that joint opens, water tracks behind the unit into the wall cavity and down to the subfloor.

Homeowners in Whitehouse Station usually noticed a soft spot near the toilet or a stain on the ceiling below long before they noticed the tub.

By then it was a subfloor repair, not a caulking job—which is why we opened the wall and looked before quoting.

Could an engineered truss floor be tiled without cracking it?

Yes, with the right build-up.

Open-web trusses and I-joists span farther than old dimensional lumber, and that span means more bounce. Tile does not tolerate bounce.

We checked deflection first, added a second layer of plywood where the span called for it, and set an uncoupling membrane between substrate and tile so seasonal movement did not telegraph into the grout.

On large-format tile in these houses that membrane was not optional.

Did the crew work around a commuter schedule?

Yes, and around Whitehouse Station a lot of households were out the door before 7 for the Raritan Valley Line.

We started at 6, which usually meant we were set up before people left and cleaning up before they were back.

Where an owner would rather we were not in the house unattended, we scheduled around their hours instead.

Project record

Completed work in Whitehouse Station

Two showers, picket and lattice tile

Whitehouse Station, NJ · 08889 · Two bathrooms

Photographed during installation

Two showers in the same house, deliberately different. The first is curbless, with an elongated picket mosaic feature wall in marble-look porcelain framed by large-format panels, a hexagon mosaic pan and brass trim carried into the drain. The second uses a woven lattice of wood-look and marble-look tile as a full-height feature wall behind glass, over a pebble pan. Both are shown mid-installation, before paint and glass.

Questions

Permits, timelines and the questions that came up on these jobs